Highland Elementary School

 

Fun Facts:

Our school was built in 1938 and holds 17 classrooms. This is the oldest building in the district and has two floors - a unique and very traditional design. The school had additions built in 1966 and 1973. The facility also includes one team-teaching classroom at grade one.
We provide hands-on learning and meaningful work for our students.
Highland has Internet access in each classroom. All staff members have been trained in using technology across the curriculum. Teachers have also participated in a special staff development program in the area of literacy. All students receive small group guided reading instruction at their instruction level each day. This is accomplished through the use of our special collection of tradebooks.
Children are also provided with music, art, physical education, and library services. A guidance counselor visits the school one day per week. Children with special needs are instructed by a resource room facilitator, tutors or our part-time speech and language therapist. A registered school nurse is at the school every day from 10 a.m. to 2 p.m.
The PTA provides a high level of parent involvement at Highland. The association is very supportive of students' academic and social growth and sponsors many after school programs.
Ongoing Fund-raisers have helped install new equipment on the playground.

 

Recent Improvements:

In 2006, we replaced two sections of terrazzo floor.

In spring 2005, our PTA Landscape committee improved our main entrance and provided two benches for this area. The school also provided two benches for our west end waiting area.

In 2005, all ceiling fans were replaced and our last window screens were installed.

In 2004, we replaced all of our cafeteria tables

In 2004 we replaced the main roof, added a concrete ramp at the west door and replaced two exterior doors.

Kitchen painted, 2003

New water line and meter installed, 2003

New hot water heaters installed in all restrooms, 2003

Repair, painting and caulking of gym windows, 2003.

 In 2001 a new shared parking lot was constructed for the Highland and Lakeview schools.

Phones installed in all classrooms, 2001.

In 2000, the school's exterior walls were tuck-pointed and sealed. A new roof was installed along with a new public address system. An accidental fire resulted in the painting of all classrooms, new ceiling tile installed and new carpet and lockers on the second floor.

Our library was moved from the second to first floor in 1996. Our library is now more than twice the size and offers a computer station. Other improvements to the facility include: repainting of the gym/classrooms, new carpeting throughout, and the installation of audio enhancement systems in several classrooms. The boiler system was completely replaced in 1996. Our playground was community built in 1990 and renovated in 1996. A new outdoor pavilion was added to the site in 1999.